  • Development Activity

  • Development

Development

Easily permit difficult and complicated development activities

  • Processing Procedure (1)

    For solar power projects
    to introduce simplified procedures for development activities
    shortcuts
  • Processing Procedure (2)

    Procedures for
    receiving, reviewing, investigating, and negotiating with relevant ministries.
    Shortcuts
  • Application documents

    If the complex administrative procedures Meet the one-stop solution
    simplifies jeolchaeul based on the know-how to many
    shortcuts
  • Deliberation contents

    Accurate and in-depth review and pre-planned
    increase your "investment"
    shortcut

Total Solution for Grand Sun Technology Development

Permits demanding and complex development activities! The Grand Sun Technology Team will solve it 'directly'

  • The Grand Technology Corp. possesses outstanding technology equipped with R & D R & D centers.
  • The Grand Technical Team is a company where over 100 professional personnel are always resident.
  • The Grand Technology Team is a company with trust based on long-standing know-how since 2005.

Submit application
(developer)

Review
of standards for permitting development activities (permission holder)

Consent for permission to
listen
to opinions of city ​​and city planning operators
(permission holder)

Permission, disapproval,
conditional permission disposition
(permission holder)

Development act
(developer)

Agenda item completion agreement
completion inspection
(permission holder)

  Development Act Permit Procedure

  • 01 Application submission (Original documents)

    • application
    • Documents proving ownership or use of the land
    • Construction or business related books such as layout
    • Design book (for installation of a work piece)
    • Documents describing the purpose and scale of the building
    • Types of public facilities that are abolished, replaced, or to be installed Records, drawings, and details of owners, etc.
    • Design book and statement for environment prevention, environmental pollution prevention, landscape prevention, etc.

  • 02 Review and investigation

    • Appropriate for the size of development level prescribed by Presidential Decree considering the characteristics of each application
    • * Urban areas less than 10,000 to 30,000 square meters
      * Managed areas : less than 30,000 square meters
      * Agricultural and forest areas : less than 30,000 square meters
      * Natural environment conservation areas : less than 5,000 square meters
    • Should not be placed in the contents of the city management plan
    • There should be no obstacle to the implementation of city planning projects.
    • In harmony with the surrounding environment or landscape, such as the land use status or land use plan of the surrounding area, the height of the building, the slope of the land, the condition of the trees, the drainage of water, the drainage of river and lake wetlands.
    • The plan should be appropriate for the installation of infrastructure according to the development activity or securing the necessary land.

  • 03 Consultation with related departments

    • Farmland (permission for farmland only)
    • Mountain area (permit for exclusive use of mountain area)
    • Related Practices (Review whether other laws are in conflict)
    • Military Corps (10 days)
    • Han River Basin Environment Authority (30 days)
    • Road Management Authority (Korea Expressway Corporation, Suwon National Highway Management Office, etc.)
    • Road Project Authority (Gyeonggi-do Construction Headquarters, Seoul Regional Construction Management Administration, etc.)
    • Related organizations (railway facility management corporation, etc.)

  • 04 Development activity permission and notification

    • Construction must be completed (completed) within the period of permission for development activities.
    • If not completed within the permit period, apply for extension of the period before the expiration of the permit period (one time)
    • In the case of development activities in accordance with Article 55 (6) of the Enforcement Decree of the National Land Planning and Use Act, the purpose of the building shall not be changed.
    • Paragraph 3 above excludes changes between buildings that do not apply joint development.

  Application documents for development activities

Grand Sun Technology Team
One Stop Total Solution

Our “technology” is broad, but the
goal is your “investment value”

Application form for development permissionSubmit required documents in the form of the National Land Planning Act

creation criteria * Required documents are subject to books written based on the Development Permit operating instructions (Ministry of Transportation Directive) Appendix 1
- ownership of land cases Or documents proving that you can perform development activities on the land, such as the right to
use.-Construction or business related documents such as layout drawings (in case of transformation of land and collection of soil)-Design
book (in case of installation of a work that is not subject to the construction method ) )
-Documents describing the purpose and scale of the building (in the case of the transformation of the land for the purpose of building the building)
-Types of public facilities that are abolished, replaced, or newly installed by the implementation of development activities, such as taxation, ownership, etc. And drawings and budget statement (in case of land change and soil collection)-Design
book for risk prevention, environmental pollution prevention, landscape, landscaping, etc. and its budget statement (Excluding the case of land
division )-Documents necessary for consultation with the heads of related administrative agencies
Proof of land ownership
Construction plan including layout
Design Book
Building uses and manuals
Drawings, budget statement
Types of new facilities to be installed, details, owner's protocol

Design book and budget statement for risk prevention, environmental pollution prevention, progress / landscape
In case of deliberation, additional documents must be submitted

  Deliberation of development activities

Grand Sun Technology Team
One Stop Total Solution

"2005-long-standing know-how" shortened the "procedure"

Adequacy of location Whether there is a need for conservation, such as tidal currents, tree habitats, and excellent farmland, whether the development activities are harmonized with surrounding areas, or whether they are damaged in nearby areas
Infrastructure planning Appropriateness of the access road considering the size of development and traffic volume, appropriateness of internal traffic, and installation of water and sewerage according to the content of development activities.
Protection of surrounding environment and landscape Whether the development activity damages the surrounding natural landscape or aesthetics? Is the height, shape, and color of the building or work piece harmonized with the surrounding structure? Is the development activity concerned about environmental pollution, destruction of the ecosystem, and occurrence of hazards, and measures to prevent them have been established? Whether
Safety and disaster prevention plan Installation of drainage facilities and adequacy of installation Adequacy and planning of safety measures in mountainous areas with slopes Adequacy of safety measures when installing retaining walls or inclined surfaces of slopes or incisions
온라인
문의

1800
8513

1:1카톡상담