Processing Procedure (1)
For solar power projectsProcessing Procedure (2)
Procedures forApplication documents
If the complex administrative procedures Meet the one-stop solutionDeliberation contents
Accurate and in-depth review and pre-plannedTotal Solution for Grand Sun Technology Development
Permits demanding and complex development activities! The Grand Sun Technology Team will solve it 'directly'
01 Application submission (Original documents)
02 Review and investigation
03 Consultation with related departments
04 Development activity permission and notification
Grand Sun Technology Team
One Stop Total Solution
Our “technology” is broad, but the
goal is your “investment value”
Application form for development permission | Submit required documents in the form of the National Land Planning Act creation criteria * Required documents are subject to books written based on the Development Permit operating instructions (Ministry of Transportation Directive) Appendix 1 - ownership of land cases Or documents proving that you can perform development activities on the land, such as the right to use.-Construction or business related documents such as layout drawings (in case of transformation of land and collection of soil)-Design book (in case of installation of a work that is not subject to the construction method ) ) -Documents describing the purpose and scale of the building (in the case of the transformation of the land for the purpose of building the building) -Types of public facilities that are abolished, replaced, or newly installed by the implementation of development activities, such as taxation, ownership, etc. And drawings and budget statement (in case of land change and soil collection)-Design book for risk prevention, environmental pollution prevention, landscape, landscaping, etc. and its budget statement (Excluding the case of land division )-Documents necessary for consultation with the heads of related administrative agencies |
---|---|
Proof of land ownership | |
Construction plan including layout | |
Design Book | |
Building uses and manuals | |
Drawings, budget statement | |
Types of new facilities to be installed, details, owner's protocol | |
Design book and budget statement for risk prevention, environmental pollution prevention, progress / landscape | |
In case of deliberation, additional documents must be submitted |
Grand Sun Technology Team
One Stop Total Solution
"2005-long-standing know-how" shortened the "procedure"
Adequacy of location | Whether there is a need for conservation, such as tidal currents, tree habitats, and excellent farmland, whether the development activities are harmonized with surrounding areas, or whether they are damaged in nearby areas |
---|---|
Infrastructure planning | Appropriateness of the access road considering the size of development and traffic volume, appropriateness of internal traffic, and installation of water and sewerage according to the content of development activities. |
Protection of surrounding environment and landscape | Whether the development activity damages the surrounding natural landscape or aesthetics? Is the height, shape, and color of the building or work piece harmonized with the surrounding structure? Is the development activity concerned about environmental pollution, destruction of the ecosystem, and occurrence of hazards, and measures to prevent them have been established? Whether |
Safety and disaster prevention plan | Installation of drainage facilities and adequacy of installation Adequacy and planning of safety measures in mountainous areas with slopes Adequacy of safety measures when installing retaining walls or inclined surfaces of slopes or incisions |